School Construction Cost Planning: Iseyin, Nigeria

Iseyin school cost planning using the World Bank ICP 2021 national construction price-level index of 72.8, plus a GeoNames-based local comparable-search shortlist.

On this page

Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/NGA/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames NG dump](https://download.geonames.org/export/dump/NG.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2337181). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Direct answer

For early school construction cost planning in Iseyin, the World Bank ICP reports a 2021 Nigeria construction price-level index of 72.8, with the world equal to 100. This is a national comparison—not a Iseyin NGN/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Nigeria in 2021; it does not measure a Iseyin market basket or current school tenders. GeoNames 2337181 records the locality at 7.9702, 3.5963, with snapshot population 365,300. That ranks Iseyin 42 of 50 listed places, while Oyo is the nearest listed peer at about 39 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.

Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.

What does the 72.8 construction index mean?

The World Bank ICP 2021 construction PLI for Nigeria is 72.8, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that school work in Iseyin costs 0.728 times a current world rate.

Which Iseyin inputs are known?

The reproducible locality point is 7.9702, 3.5963 (GeoNames 2337181). Its snapshot population is 365,300, ranked 42 of 50 listed places; GeoNames classifies it as a second-order administrative seat in administrative area 32. These facts shape the local comparable search, not the price.

What must a project estimate add?

For a Iseyin school project, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works. Use a consistent gross-floor-area basis and record the following before reliance.

Estimate fieldScreening recordProject requirement
National contextICP 2021 PLI 72.8Retain only as dated cross-country context
Local NGN/m² rateNot suppliedCurrent comparable with named source and base date
Area and scopeGross floor area; scope unresolvedMeasurement standard, specification and procurement route
AdditionsNot suppliedTaxes, fees, site work, contingency and escalation
ReviewAutomated source and arithmetic QAQualified local cost review

Iseyin comparable-location search screen

This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.

Listed placeGreat-circle km from IseyinSnapshot populationAdmin area
Oyo39736,07232
Ogbomoso73433,03032
Ibadan743,649,00032
Abeokuta95735,00016
Osogbo108645,00042
Yenagoa449365,00052
Gboko600365,00026
Umuahia509370,00045

Price-level normalization worksheet

For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (72.8 ÷ P). At P = 100 the dimensionless ratio is 0.728; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.

InputRecorded valueRelease condition
Target national PLI72.8 (World = 100, 2021)Screening context only
Reference construction PLI PUser-supplied from the same ICP classification/yearMust match reference rate country
Validated reference rate RUser-suppliedNamed source, currency, date, area and scope
Local Iseyin adjustmentNot assertedReplace with current local comparable evidence
Result statusScreening normalizationNot a budget, quote or tender estimate

Sources and method

National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames NG dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2337181). The PLI is not a city cost/m² rate, current escalation series or tender estimate.

Frequently asked questions

Does the 72.8 index give a school cost per m² for Iseyin?

No. 72.8 is the World Bank ICP 2021 national construction price-level index for Nigeria, with the world equal to 100. It is a cross-country screening statistic, not a Iseyin NGN/m² rate, escalation index, quote or tender estimate.

How should a Iseyin school estimate replace this screening benchmark?

Collect current Iseyin comparables on a consistent gross-floor-area basis, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.