School Construction Cost Planning: Yola, Nigeria
Yola school cost planning using the World Bank ICP 2021 national construction price-level index of 72.8, plus a GeoNames-based local comparable-search shortlist.
On this page
Last updated September 15, 2026 · National screening observation from the [World Bank ICP 2021 API](https://api.worldbank.org/v2/sources/90/country/NGA/classification/PX.WL/series/1501200/time/YR2021/data?format=json) and [ICP data documentation](https://www.worldbank.org/en/programs/icp/data); locality and population from the [GeoNames NG dump](https://download.geonames.org/export/dump/NG.zip) (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2318044). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Direct answer
For early school construction cost planning in Yola, the World Bank ICP reports a 2021 Nigeria construction price-level index of 72.8, with the world equal to 100. This is a national comparison—not a Yola NGN/m² rate or tender estimate—so replace it with current local evidence before budgeting or procurement. The observation covers construction across Nigeria in 2021; it does not measure a Yola market basket or current school tenders. GeoNames 2318044 records the locality at 9.2084, 12.4815, with snapshot population 460,000. That ranks Yola 32 of 50 listed places, while Gombe is the nearest listed peer at about 188 km. Use these facts only to plan the comparable search. Obtain current local rates on a consistent area basis, then reconcile scope, taxes, fees, contingency and escalation. Retain the source, base date and reviewer when local evidence replaces the screening ratio.
Content and cited inputs reviewed by Scott Barrington, Harth founder and architectural technology specialist · Published 2026-08-26 · Updated 2026-09-15.
What does the 72.8 construction index mean?
The World Bank ICP 2021 construction PLI for Nigeria is 72.8, compared with a world benchmark of 100. It is a national spatial price comparison assembled for the 2021 reference year. It does not say that school work in Yola costs 0.728 times a current world rate.
Which Yola inputs are known?
The reproducible locality point is 9.2084, 12.4815 (GeoNames 2318044). Its snapshot population is 460,000, ranked 32 of 50 listed places; GeoNames classifies it as a first-order administrative seat in administrative area 35. These facts shape the local comparable search, not the price.
What must a project estimate add?
For a Yola school project, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works. Use a consistent gross-floor-area basis and record the following before reliance.
| Estimate field | Screening record | Project requirement |
|---|---|---|
| National context | ICP 2021 PLI 72.8 | Retain only as dated cross-country context |
| Local NGN/m² rate | Not supplied | Current comparable with named source and base date |
| Area and scope | Gross floor area; scope unresolved | Measurement standard, specification and procurement route |
| Additions | Not supplied | Taxes, fees, site work, contingency and escalation |
| Review | Automated source and arithmetic QA | Qualified local cost review |
Yola comparable-location search screen
This shortlist is computed from the checked GeoNames snapshot. Distance and population help prioritize where to request comparables; neither is used as a cost multiplier.
| Listed place | Great-circle km from Yola | Snapshot population | Admin area |
|---|---|---|---|
| Gombe | 188 | 560,000 | 55 |
| Maiduguri | 303 | 1,110,000 | 27 |
| Bauchi | 314 | 693,700 | 46 |
| Jos | 402 | 1,040,000 | 49 |
| Gboko | 437 | 365,000 | 26 |
| Ikare | 763 | 465,000 | 48 |
| Okene | 711 | 479,178 | 41 |
| Uyo | 682 | 436,606 | 21 |
Price-level normalization worksheet
For a validated reference rate R from a country with construction PLI P, the transparent screening calculation is R × (72.8 ÷ P). At P = 100 the dimensionless ratio is 0.728; no world cost rate is asserted. Keep the reference rate's currency, base date, area basis and scope attached.
| Input | Recorded value | Release condition |
|---|---|---|
| Target national PLI | 72.8 (World = 100, 2021) | Screening context only |
| Reference construction PLI P | User-supplied from the same ICP classification/year | Must match reference rate country |
| Validated reference rate R | User-supplied | Named source, currency, date, area and scope |
| Local Yola adjustment | Not asserted | Replace with current local comparable evidence |
| Result status | Screening normalization | Not a budget, quote or tender estimate |
Where can you explore related guidance?
- Explore all construction costs guidance
- Office Construction Cost Planning: Yola, Nigeria
- House Construction Cost Planning: Yola, Nigeria
- Retail Construction Cost Planning: Yola, Nigeria
- School Construction Cost Planning: Gombe, Nigeria
- All construction costs guidance for Nigeria
- Climate Design Data: Yola, Nigeria
- Sun Path: Yola, Nigeria
Sources and method
National screening observation from the World Bank ICP 2021 API and ICP data documentation; locality and population from the GeoNames NG dump (CC BY 4.0 snapshot 2026-08-26, GeoNames ID 2318044). The PLI is not a city cost/m² rate, current escalation series or tender estimate.
Source links
Frequently asked questions
Does the 72.8 index give a school cost per m² for Yola?
No. 72.8 is the World Bank ICP 2021 national construction price-level index for Nigeria, with the world equal to 100. It is a cross-country screening statistic, not a Yola NGN/m² rate, escalation index, quote or tender estimate.
How should a Yola school estimate replace this screening benchmark?
Collect current Yola comparables on a consistent gross-floor-area basis, reconcile teaching spaces, specialist rooms, safeguarding, sports provision and external works, and state base date, currency, taxes, fees, site work, contingency and escalation. A qualified local cost professional should review the resulting project estimate.
Related pages
- School Construction Cost Planning: Yenagoa, Nigeria
Yenagoa school cost planning: World Bank ICP 2021 construction PLI 72.8 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Yew Tee, Singapore
Yew Tee school cost planning: World Bank ICP 2021 construction PLI 97.6 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Yishun New Town, Singapore
Yishun New Town school cost planning: World Bank ICP 2021 construction PLI 97.6 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Yuen Long, Hong Kong SAR, China
Yuen Long school cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Yuen Long Kau Hui, Hong Kong SAR, China
Yuen Long Kau Hui school cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
- School Construction Cost Planning: Yuen Long San Hui, Hong Kong SAR, China
Yuen Long San Hui school cost planning: World Bank ICP 2021 construction PLI 141.8 (World=100), scope limits and 8 GeoNames comparison locations.
The AI-powered workspace for architects.